Please be advised that certain records have been redacted or withheld consistent with the following subsections of New York State’s Public Officers Law §87(2):
Portions of the records have been redacted or withheld in their entirety under section 87(2)(a) as the information is specifically exempted from disclosure by state or federal statute. [Including, but not limited, to 49 USC §40119 and by extension 49 CFR, Part 15.
Portions of the records have been redacted or withheld under section 87(2)(b) on the ground that disclosure of the information would constitute an unwarranted invasion of personal privacy under the provisions of Public Officers Law section 89(2).
Portions of the records have been redacted or withheld under section 87(2)(d) as the information constitutes trade secrets or was submitted to an agency by a commercial enterprise or derived from information obtained from a commercial enterprise and which if disclosed would cause substantial injury to the competitive position of the subject enterprise.
Portions of the records have been redacted or withheld under section 87(2)(f) on the ground that disclosure of the information could endanger the life or safety of any person.
Portions of the records have been redacted or withheld under section 87(2)(i) on the ground that disclosure would jeopardize the capacity of an agency or an entity that has shared information with an agency to guarantee the security of its information technology assets, such assets encompassing both electronic information systems and infrastructures.
Final version as of January 8, 2018
- Volume 1 – Design-Build Agreement
This Design-Build agreement, entered into on this 29th day of December 2017, by the MTA Capital Construction Company acting on behalf of the Metropolitan Transportation Authority, hereinafter referred to as “MTA,” and 3rd Track Constructors, a joint venture consisting of John P. Picone, Inc., Dragados USA, Inc., Halmar International LLC, and CCA Civil, Inc., hereinafter referred to as the “Design Builder.”
- Volume 1 – Design-Build Agreement
- Volume 1 – Part 1A
- Volume 1 – Part 1B
- Volume 1 – Part 1C
- Volume 1 – Part 2
- Volume 1 – Part 3
- Volume 1 – Part 4A
- Volume 1 – Part 4B
- Volume 1 – Part 4C
- Volume 1 – Part 5
- Volume 2 – General Provisions
The Contract Documents set forth the entire agreement between MTA and the Design-Builder, superseding all prior agreements and understanding written or oral, and may not be altered or modified except in writing by MTA’s Procurement Office. - Volume 3 – Technical Provisions
Most environmental compliance requirements arising from the EIS process are included in the Technical Provisions and other Contract Documents.
- Volume 3 – Part 1
- Volume 3 – Part 2
- Volume 4 – Utility Requirements
Utility Requirements provides information on the Design-Builder’s overall responsibilities as they relate to existing and/or new utilities, the way utilities may be protected, relocated, upgraded, constructed or incorporated into the construction. - Volume 5 – Technical Specifications
Most environmental compliance requirements arising from the EIS process are included in the Technical Provisions and other Contract Documents. - Volume 6 – Environmental Compliance Form
Additional Environmental Compliance requirements arising from the EIS and findings are as follows.. - Volume 7 – Contract Drawings
- Volume 8 – Directive Drawings – Volume 8 has been redacted in its entirety
- Volume 9 – Standards – Volume 9 has been redacted in its entirety
- Volume 10 – Existing Conditions Data – Volume 10 has been redacted in its entirety