C&D Contracting: Upcoming Opportunities

Updated Mar 28, 2022

Projects to be solicited in Spring 2022

Under $25 million

Project

Method

Agency

Boring Services: Brooklyn, Queens, and Staten Island

DBB (IFB)

NYCT

Boring Services: Manhattan and the Bronx

DBB (IFB)

NYCT

Cleaning and Painting: RFK Bridge - Queens Approach

DBB (A+B)

B&T

Component Repairs: 207 St Overhaul Facility

DBB (A+B)

NYCT

Expansion: Eltingville Park and Ride

DBB (A+B)

NYCT

Fan Plant Computer Aided Decision Support (CADS) Pilot: 8 Fan Plants / Nassau Loop

Design Build

NYCT

Fire Protection Improvements: Hillside Support Facility Water Main

Design Build

LIRR

Motor Generators: Hillside & Babylon

RFP

LIRR

Lower Level Deck Rehabiliation, Painting, and Weigh-In-Motion Installation: Verrazzano-Narrows Bridge

DBB (A+B)

B&T

Private Branch Exchange (PBX) Replacement: 18 Locations System-wide

RFP

MNR

Replacement of Node House Roofing System: 23 Locations System-wide

DBB (A+B)

MNR

Rock Slope Remediation: East of Hudson

DBB (IFB)

MNR

Sandy Resiliency 4 Pump Rooms: Jerome/Pelham Tube

DBB (A+B)

NYCT

Stairs and Ceiling Replacement: Penn Station Platforms 7 & 8

DBB (A+B)

LIRR

Structural Repairs: Coney Island Abutment Wall and St. Marks Bridge

Design Build

NYCT

Substation Painting Program: 100+ Locations System-wide

DBB (A+B)

LIRR

Replacement of 3 Substations: Jamaica, Winfield, and Grand Av

Design Build

LIRR

Test Pits: Various Locations System-wide

DBB (IFB)

NYCT

Upgrade Automotive Fuel System: Brewster and Croton Harmon Yards

Design Build

MNR

Between $25 million and $100 million

Project

Method

Agency

Early Works/Utility Relocation: Second Avenue Subway Phase 2

DBB (A+B)

C&D

Elevated Structure Repair: Hammels Wye and Over-Land Sections / Rockaway Line

Design Build

NYCT

Fire Alarm Systems and Sprinklers in Subway Facilities: 24 Locations System-wide

Design Build

NYCT

Replacement of 2 Bridges: Mount Vernon at South St and Fulton Av

Design Build

MNR

Access Improvements: Grand Central Terminal

Design Build

NYCT

Lighting, Power, and Flood Wall Upgrades: Bronx-Whitestone and Verrazzano-Narrows Bridges

Design Build

B&T

New Vehicular and Pedestrian Ramps: Randalls Island

Design Build

B&T

New Substation: Canal Street / 8th Av Line

DBB (A+B)

NYCT

Public Address / Customer Information Screens Upgrade: Canarsie Line

Design Build

NYCT

Rebuild Substations: Mamaroneck and Harrison, New Haven Line

Design Build

MNR

Replace 6 Escalators: Sutphin Blvd and West 4 St Stations

Design Build

NYCT

Replace 19 Elevators: 6 Lines System-wide

Design Build

NYCT

Under River Tube Security Phase 3: 13 Under-River Tubes (All Except 63 St)

Design Build

NYCT

Over $100 million

Project

Method

Agency

Americans with Disabiliies Act (ADA) Accessibility at 4 Stations: 95 St / 4 Av Line, Northern Blvd / Queens Blvd Line, 137 St / Broadway 7th Av Line, and Parkchester / Pelham Line

Design Build

NYCT

Communications-Based Train Control (CBTC): Crosstown Line

Design Build

NYCT

Communications-Based Train Control (CBTC): Fulton Line

Design Build

NYCT

Construct New Bus Depot: Jamaica

Design Build

NYCT

Reconstruction: Park Av Viaduct

Design Build

MNR

Station Platform / Mezzanine Component Repairs: 39 Stations System-wide

Design Build

NYCT

Station Renewal: 5 Stations / Flushing Line

DBB (A+B)

NYCT

Painting and Structural Repairs: Jamaica Line

DBB (A+B)

NYCT

Projects to be solicited in Summer/Fall 2022

Under $25 million

Project

Method

Agency

Boiler Replacement: LaGuardia and Spring Creek Bus Depots

DBB (A+B)

MTAB

Chassis Wash and Platform Lift Replacement: Tuskegee and West Farms Bus Depots

DBB (A+B)

NYCT

Electronic Security System: West 4th St/Washington Square

DBB (A+B)

NYCT

Facade Repairs: Baisley Park, JFK, and LaGuardia Bus Depots

DBB (A+B)

MTAB

Generator Replacement: Spring Creek and College Point Bus Depots

DBB (A+B)

MTAB

Reconstruction and Widening: East Bound Merge from the Verrazanno-Narrows Bridge

DBB (A+B)

B&T

Sandy Mitigation: Street Level Openings in Brooklyn, Queens, and Manhattan

DBB (A+B)

NYCT

HVAC, Fire Control, and CNG Upgrades: Spring Creek and College Point Bus Depots

DBB (A+B)

MTAB

Structural Steel and Concrete Repairs: Queens Ramps - Throgs Neck Bridge

DBB (A+B)

B&T

Mainline Switch Rehabilitation: Staten Island Railway

DBB (A+B)

NYCT

Rehabilitate Pump Room: Adams St / Broadway Line

DBB (A+B)

NYCT

Roof Topping and Expansion Joints: Michael J. Quill Depot

DBB (A+B)

NYCT

Between $25 million and $100 million

Project

Method

Agency

Connection-Oriented Ethernet (COE), Phase 3C: System-wide Integration

DBB (A+B)

NYCT

New Substation: 28 St / 8 Av Line

DBB (A+B)

NYCT

Platform Component Repairs at 2 Stations: 46 St and 36 St / Queens Boulevard Line

DBB (A+B)

NYCT

Platform Component Repairs at 5 Stations: 50 St, 79 St, 86 St, 145 St, and 191 St / Broadway-7th Avenue Line, and Track Replacement at 86 St

DBB (A+B)

NYCT

Rehabilitation of Circuit Breaker Houses: 5 Locations on the 7 Av, Brighton, and Jamaica Lines and in Livonia and Jamaica Yards

DBB (A+B)

NYCT

Replace Equipment: 9 Substations on the 8 Av, Dyre, Concourse, and Queens Blvd Lines and at Jamaica Yard

DBB (A+B)

NYCT

Replace Electrical/Mechanical Equipment: South Channel Bridge

DBB (A+B)

NYCT

Sandy Mitigation: Steinway Tube

DBB (A+B)

NYCT

Station Renewals at 3 Stations: 85 St-Forest Pkwy, 75 St-Elderts Lane, and Cypress Hills / Jamaica Line

DBB (A+B)

NYCT

Substation Renewals: 3 Locations on the 6 Av, Culver, and Queens Blvd Lines

DBB (A+B)

NYCT

Over $100 million

Project

Method

Agency

Painting and Structural Repairs: Portal to 24 Av and at 9 Av Station / West End Line

DBB (A+B)

NYCT

Painting and Structural Repairs: Portal to West 8 St / Culver Line

DBB (A+B)

NYCT

Platform Screen Doors at 3 Stations: Times Square / Flushing Line, 3 Av / Canarsie Line and Sutphin Blvd / Archer Av Line

Design Build

NYCT